Void Standard
Introduction
Our Void Standard details the standard to which we will bring our empty properties between lettings. It aims to ensure that properties are safe, secure, clean and free from health and safety hazards as defined by the Housing Health and Safety Rating System and the Homes (Fitness for Human Habitation) Act 2018. So that we manage our repairs to empty properties efficiently and in the most cost-effective way. The Standard supports the specific commitments contained in our Lettings Policy, to repair and let properties to a defined property standard and to minimise the period that properties are empty. This document contains detailed guidance intended for staff use. A summary of the Standard is made available for residents as part of the lettings process. So as not to delay a letting, it should be noted that some non-urgent repairs may be carried out after the start of the new tenancy. In bringing properties to the required standard, staff must be vigilant at identifying repairs that should appropriately be charged to the outgoing tenant.
Scope
This document applies to re-let properties within our General Needs and Older Peopleās Services Housing stock. For Supported and Temporary Accommodation schemes, please refer to the relevant sections in this standard.
1.0 General External Works
Repairs instructions must take account of any conservation and preservation areas and any Tree Preservation Orders
1.1 Property Structure
Guidelines:
Property to be secure and water-tight. Repairs may be carried out in tenancy, depending on severity.
Instructions:
- Visual check to roof and appropriate repairs carried
out to ensure wind and water tight. - Check for any defect or holes to external
brickwork/render, all holes to be filled and any defects
repaired. - Check for signs of any structural damage, movement,
penetrating or rising damp.
1.2 Garages, Sheds and Outbuildings
Instructions:
- Garage to be clear of debris.
- Check to see if garage door is functional, if not, make safe and repair in tenancy.
- If greenhouses and wooden sheds are in very good condition, to be offered as a gift to incoming tenant and no further maintenance to be carried out. Otherwise remove and dispose.
- Remove wooden sheds with roof containing ACM (see 2.11)
- Assess any brick-built sheds with roof/outbuilding structure, if ok ā leave and maintain. If in disrepair, assess cost of removal
vs. 10-year maintenance cost - Remove & cap off outside WCs/sinks and make
good
1.3 Paths and Steps
Guidelines:
All footpaths, driveways, steps and handrails within the boundary. Remove anything consider to be a trip hazard.
Instructions:
- Ensure no obvious trip hazards are present to footpaths, repair as required.
- Maintain any steps within the boundary, eradicate any H&S hazards
- Inspect handrails and key clamps if present
- Decking to be removed and disposed.
- At time of void, any other significant hazards to be removed or repaired
1.4 Boundaries
Guidelines:
To include boundary walls, fencing and gates. All rear garden boundaries to have a minimum of 900mm chain link to mark the boundary. Front garden boundary line to be marked.
Instructions:
- Fencing in good condition will be left as is.
- If the fence is likely to last more than 2 years and cost
of repair is no more than 40% of the replacement cost, then carry out repair to existing wooden fence panel (like for like). - Rear garden only ā If full replacement – install 1×1.8m privacy panels (use existing panels if in perfect working order) between, chain link (900mm ā unless next to public boundary then 1.8m high fencing) for remainder of boundary (may be carried out in tenancy).
- Front garden ā Chain link only if requires replacement.
- Gates to be in working order to rear garden if they
form part of the boundary. - Front gates if in good order leave and new tenants to
take responsibility; otherwise remove - Any rear dividing fences on new developments will be
repaired or renewed to the development specification - Chain link fence to be installed to front of property
where garden is likely to be used for parking, where
there is no dropped kerbs.
1.5 Gardens
Guidelines:
To include front, rear, side and separate gardens.
Instructions:
- Grass to be at maintainable height.
- All brambles and nettles are to be removed to ground level.
- All shrubs/bushes and hedgerows to be cut to max 6ft high.
- If a tree represents a risk to either persons or property, instruct the Grounds Maintenance Team who will carry out a survey and if necessary, instruct a specialist contractor for removal (ensuring TPOs are checked). (may be carried out in tenancy).
- Presence of invasive plants e.g. Japanese knotweed
or Hogweed to be referred to Ground maintenance
team, for further action - All ponds to be removed and filled in.
- Existing clothes line posts, rotary lines or similar shall
be left if safe and in condition, removed if not.
1.6 Drainage Systems
Guidelines:
Includes manholes, covers, drains, gutters, gullies and rainwater systems on the grounds of the property
Instructions:
- Visual inspection to be carried out on the guttering,
- checking for leaks and blockages.
- Clear blocked drains, gutters and gullies if necessary.
- Manhole covers, gulley surrounds to be secure and in
good condition
1.7 External Doors
Guidelines:
If replacement external door required, refer to investment works standard. Flat doors which exit to a communal area to be a fire door. Check for any outstanding Fire Risk Assessment actions
Instructions:
- One lock to every external door to be replaced
- Provide a minimum of 3x working keys for each lock
(to include post box) - Provide 2x Fobs or keys for communal entrance doors
- Letter box/plate in working order (provide key if applicable). Ensure there is ability to receive mail.
- External doors to be in working order. (This includes communal doors where applicable. Please refer to PHG repairs standard).
- Cat flaps to be removed
- If doorbell is in working order leave, otherwise remove
- All closures to be in working order
- If fire door and/or frame damaged or breached replace
with FD30s standard including suitable furniture ā
which requires sign-off by qualified TRADA recognised
operatives
1.8 Communal Areas
Instructions:
- All common/communal areas both internal and external should be free from any defects/repairs. Major repairs that are deemed to be a Cat 1 hazard under The Housing Health and Safety Rating System or Fitness for Human Habitation Act 2018 must be carried out as an emergency and in all cases before the property is re-let.
- Rotary lines shall be provided for sheltered schemes.
2.0 System Testing and Compliance
2.1 General Gas Information
Guidelines:
Property Services Gas safe technicians or approved Gas Safe subcontractor partner to carry out gas safety check and issue LGSR.
Gas supply will be tested and/or capped when the previous tenant vacates the property. A new LGSR will be carried out just prior to or on the day that the new resident moves in. The officer arranging the new tenancy will ensure that a Landlords Gas Safety Check has already been completed and a record issued within 28 days. In limited circumstances, where no intrusive void maintenance works are to be undertaken during the void period; for example, an electrical inspection and gas check only are required, it will not be necessary to undertake a
two-stage gas void safety process as described above.
2.2 Gas Safety Check, LGSR and appliances
Instructions:
- All common/communal areas both internal and external should be free from any defects/repairs. Major repairs that are deemed to be a Cat 1 hazard under The Housing Health and Safety Rating System or Fitness for Human Habitation Act 2018 must be carried out as an emergency and in all cases before the property is re-let.
- Rotary lines shall be provided for sheltered schemes.
2.3 Gas Heating Systems
Instructions:
- Heating systems to be in good working order (including thermostats)
- Ensure all heating appliances are functional
- Independent Gas fires (not back boiler) to be removed
- All habitable rooms to have a source of heating air sourced heat pumps
2.4 Carbon Monoxide
Instructions:
- Working CO detector to be provided for any open flue
appliances in use - Supply CO alarm in room that contains any gas or fuel
burning appliance - Carbon monoxide detector to be installed by the boiler.
2.5 General Electrical Installation Information
Guidelines:
Electrical tests are to be carried out in a 2 part procedure, the 1st test is to be a visual inspection where any issue are to be highlighted to the Electrical team leader. Remedial works are to be carried out to ensure a satisfactory outcome at 2nd stage where Code 1 or 2 āunsatisfactoryā observations must be corrected. Certificate to then be issued upon completion. If property tested within a 2 year period then the engineer is to decide if an advanced visual can be completed. All Electrical is carried out by NICEIC approved Electricians. Electric will be live when the Final Void Inspection is completed.
2.6 Electrical, Oil & Solid Fuel Heating Systems
Instructions:
- All hard-wired equipment i.e. storage heaters, immersions to be in working order.
- Clean /replace filters to heat recovery units.
- Replace immersion thermostat to thermal cut-out type
if not already in place - Electric bar element type heaters to be removed.
- Electrical storage Heaters, electric boilers and any remaining warm air heating systems will be removed and replaced with a low carbon renewable heating system.
- Air Source Heat Pump systems will receive full service check. Any resultant remedial identified during the service will be rectified by a suitably qualified engineer.
- Oil heating systems will be accessed for the suitability of replacement with a new low carbon heating system.
- Where an oil heating system is old or in poor condition it will be replaced with a low Carbon renewable technology such as an air source heat pump.
- Properties that are let with Oil heating systems will receive full service check. Any resultant remedial works identified will be rectified by a suitably qualified engineer.
- All solid fuel appliances will be removed during the void period and any associated chimney opening made good.
2.7 Extractors
Instructions:
- Remove built in cooker hoods (unless no other form of
extraction/ventilation) - Provide new filter for existing cooker hoods (for incoming tenant to fit)
- Kitchen and bathroom to have an extractor fan where possible
- Please note: if mechanical extractor fans cannot be fitted a whole house ventilation system may be specified.
2.8 Smoke Alarms
Instructions:
- Mains operated, linked smoke alarms with battery back up to be present and in working order
- A wired heat sensor to be present and in working order in the kitchen.
- At least 1 smoke alarm on each storey of the property where there is a room used as living accommodation.
- Test and silence control switch to be provided for co and smoke alarms.
- All detectors to be in good condition and have at least 5 Years until replacement date.
2.9 General Asbestos Information
Guidelines: For any property built before the year 2000, an asbestos management report will be provided. If investment or intrusive works are required, instruct for an intrusive survey and carry out appropriate actions. No investment or intrusive works to be carried out until survey is received.
Instructions:
- Mains operated, linked smoke alarms with battery back up to be present and in working order
- A wired heat sensor to be present and in working order in the kitchen.
- At least 1 smoke alarm on each storey of the property where there is a room used as living accommodation.
- Test and silence control switch to be provided for co and smoke alarms.
- All detectors to be in good condition and have at least 5 Years until replacement date.
2.10 Asbestos Survey/Testing
Instructions:
- If there is no existing asbestos survey available, STAR Housing will instruct an approved asbestos surveying subcontractor to carry out a management survey to the dwelling. If any works identified entail disturbing any suspected ACMs, instruct a refurbishment survey to these targeted areas (e.g. kitchen, bathroom, artex ceilings etc.) prior to works commencing.
2.11 Asbestos Removal
Instructions:
- Follow recommendations from asbestos survey
- Instruct approved asbestos removal subcontractor to remove or encapsulate where required
2.12 Energy Performance Certificate
Instructions:
- An EPC certificate to be made available for the viewing of the property and issued to the new tenant.
- If there is no record of an EPC on the national register, instruct approved Energy Performance Officer to provide an EPC certificate.
3.0 General Building Works
3.1 Internal Doors
Guidelines:
To include kitchen cupboard doors and fitted wardrobe doors
Instructions:
- Doors and furniture to be fully operational
- Holes in doors to be made good to a smooth finish and repainted
- If replacement necessary, to be replaced with a painted ply flush door or painted fire door if required.
- Ensure all ironmongery and door closers are fitted where necessary
- All bathrooms and WCs to have working privacy lock
- Any glass panelled doors to be replaced with ply flush door, unless glass safety kite mark is present.
- If evidence of previous closures and are missing, replace with new to match.
3.2 Windows
Instructions:
- Windows to be secure and water tight with method of secure closure.
- All windows above ground floor to have a working restrictor.
- For locking window handles, a key to be provided. If no key, replace with push button handles only.
3.3 Stairs
Instructions:
- Staircase, balustrades, handrails, treads and risers to be in safe condition.
- Minimum of 1x handrail
- Gaps between spindles/ balustrades/ steps not to exceed 100mm
- Horizontal balustrades to be boarded to restrict
climbing.
3.4 Flooring
Instructions:
- All floors to be free from trip hazards
- Carpet grippers and threshold strips to be removed if exposed.
- Existing carpets/laminate in good condition and presentable may be left at void inspectorās discretion. To be offered as a gift to the incoming tenant. Otherwise remove and dispose.
- Remove laminate/wooden flooring if flat is above ground floor
- Remove carpet gripper where possible but leave where fixed on possible asbestos containing tiles
3.5 Decoration
Guidelines:
Walls to be free of any major defects. No decorating to be carried out. Tenants may be offered a decorating voucher to assist with the aesthetics of the interior. Internal decoration including wallpaper is tenant responsibility. If property requires full redecoration, please refer to Voids and Lettings Manager Tenants moving into Sheltered Schemes may have their home decorated, at the discretion of the Voids and Lettings manager. Tenants moving into general Voids, with disabilities, may have their home decorated, at the discretion of the Voids and Lettings manager.
Instructions:
- Inspector decides the appropriate decorating voucher to issue.
- Stain block over any offensive graffiti and smoke damage
- All polystyrene tiles and coving to be removed and
made good ready to decorate - Nails and picture hooks to be removed
- Patch repair to damaged plaster above 25mm diameter (50p)
- All cracks above 5mm to be filled
- Decoration pack to be issued if wall paper is ripped or torn.
- No mould growth to be present. If there are signs of mould growth, please refer to Repairs Team leaders to carry out before re-let.
3.6 Non-Standard Fittings
Instructions:
- Mirrors, toilet roll holders, towel rails, shower screens
etc. to be left if in good condition and no further maintenance carried out. - Toilet seats and shower curtains to be replaced
3.7 Aids and Adaptations
Guidelines:
In certain circumstances, it may be deemed beneficial that adaptations remain in situ e.g. when the property has been designed and built for a wheelchair user. The Team Leader should liaise with lettings about the suitability of the property for applicants.
Instructions:
- Check record of last service. If outstanding, arrange to service to be carried out (may be done in tenancy)
3.8 Loft Insulation
Instructions:
- Ensure loft insulation is present to the current standard.
- Loft insulation to be laid flat and tidy
3.9 Miscellaneous
Instructions:
- Where the fireplace is not the only means of heating, fireplaces to be clear of debris, blocked up, plastered, skimmed and vented
- All windows to have a curtain batten
3.10 Current building regulations
Instructions:
- Internal layout must comply with current building regulations and not be deemed unsafe and result in a cat 1 hazard as defined by The Housing Health and Rating System or The Fitness for Human Habitation Act. I.e. means of access and natural light.
3.11 Clearance
Instructions:
- Property, loft space and garden (including sheds and outbuildings) to be clear of all previous tenantsā personal belongings.
3.12 Environmental Clean and Pest Control
Instructions:
- Environmental cleans, biohazard cleans, needle sweeps and pests or rodents to be referred to voids and lettings manager and specialist contractor instructed.
4.0 Kitchen Works
4.1 Kitchen Repairs and Replacements
Instructions:
- Kitchen units and sink to be in sound and operable condition
- All worktops/surface to be free from defects and able to be kept clean.
- If replacements required, closet match possible
- Cooker space to have minimum of 150mm worktop either side of cooker.
- To ensure 600mm to 620mm spaces provided for cooker, under-counter fridge and washing machine (where possible).
- If possible, allow a minimum 500mm of work surface on each side of the sink top
- Minimum of cold feed only for washing machine space
- Supply and fit sure stop where possible
- Fit secondary stop tap where access to existing main stop tap could be an issue.
- Kitchen layout must comply with criterion C of the Decent Homes Standard and must not be deemed unsafe and result in a cat 1 hazard as defined by The Housing Health and Rating System. Where identified alterations should be made in order to comply.
Note: HHSRS Category 1 defects to be immediately resolved
by repair or reconfiguration of kitchen.
Please see attached criteria that we work to as the size of the
kitchen will dictate the maximum units we can install is
usually dictated by the size of the kitchen.
If kitchen requires replacing in near future, refer and add to
future investment works programme to be completed in
tenancy.
4.2 Kitchen Appliances
Instructions:
- For general needs properties remove built in cookersand hobs and leave cooker space (see. 4.1). Unless they were fitted as part of a project or new development in which case they would need to be gifted to the incoming resident.
- Provide either gas or electric cooker point.
4.3 Kitchen Flooring
Instructions:
- Provide a non-slip floor covering.
4.4 Kitchen Tiling and Sealant
Instructions:
- Replace any broken or cracked tiles
- Ensure a minimum of 150mm minimum splash-back fitted to all work surfaces, sanitary appliances with closest match
- Tiling behind cooker space
- Renew sealant where required
5.0 Bathroom and Plumbing Works
5.1 Bathroom
Instructions:
- To have a minimum of one safe and working wash hand basin, bath or shower and toilet.
- Replace toilet seat if not in working order or in poor condition.
- Replace any cracked/broken sanitary ware
- Plugs fitted where required
- Bath panels to be secured and fit for purpose
- Telescopic pole and shower curtain to be provided for incoming tenant to fit (except where not suitable and permanent shower rail fitting required, fit curtain)
- Ensure a fully operational ventilation system is in place.
Category 1 defects to be immediately resolved by repair
5.2 Showers (including over bath)
Instructions:
- Existing shower to remain if working with adequate pressure and compliant (remove shower if nonthermostatic to reduce scalding risk)
- Fit new shower head and hose
- If shower is missing/requires replacement fit thermostatic mixer or electric shower including full height hose and bracket. If water pressure inadequate Void and Lettings Manager to use discretion to provide alternative.
- Remove all shower screens and replace shower curtain.
5.3 Bathroom Tiling and Sealant
Instructions:
- Replace any broken or cracked tiles with closest
match - Ensure a minimum of 300mm splash-back fitted to all sanitary appliances with closest match (excluding WC)
- Renew sealant where required
- Full height tiles around shower or wall tile boards (Geo
- panels)
5.4 Bathroom Flooring
Instructions:
- Floor to be non-slip, water resistant and clean.
5.5 Cloakroom/Separate WC
Instructions:
- All WCās in outbuilding to be removed and capped.
- Separate downstairs WCās without a wash hand basin will be removed and capped.
- Replace toilet seat.
5.6 Plumbing Checks and Water Safety
All outlets should be flushed periodically to ensure safety against legionella (min every 7 days).
Once a date for re-letting has been agreed the most recent flush should not exceed 7 days or a further flush should be arranged prior to sign up
Instructions:
- Cold water tank to be free from debris and in sound
- condition with a lid.
- Mains stop tap to be checked for seizure and lubricated where necessary to ensure smooth operation
- All pipework to be free from leaks
- Check for dead legs and remove
- Outlets to be flushed on a weekly basis while void
- Ensure all taps are operational, if require replacement change with standard lever action tap
- Outside taps to remain if in good condition, otherwise cap off.
- Outside taps should have a non-return valve fitted.
6.0 Cleaning Standard
6.1 Instruction
General:
- Wash down all woodwork and doors throughout the property to remove all dirt, grease and heavy staining including wiping door handles
- Wipe down all walls to remove dirt, grease and heavy staining including walls to stairwells and cupboards.
- Remove all cobwebs including those at high level in stairwells
- Sweep all floors within the property and outbuildings, including all cupboards, sheds external stores and stair treads
- Mop and disinfect all floors within the property to remove dirt, grease and heavy staining including any vinyl floor coverings and stair treads
- Carpets cleaned if required
- Carefully wipe all electrical outlet points, light switches and switched fused spurs to remove dirt grease and heavy staining
- Carefully wipe down radiators, storage heater and boiler casings to remove dirt, grease and heavy staining
- Clean all window panes and wash down window frames inside ( and outside, if on ground floor)
- Wash down all external doors and frames to remove dirt, grease and heavy staining, including wiping door handles
Kitchen:
- Wash and disinfect all kitchen cupboards, inside and out including all door handles to remove all dirt, grease and heavy staining
- Wipe down and disinfect all worktop surfaces and wall tiles to remove dirt, grease and staining
- Wash and disinfect sink top and drainer including taps, plug and waste outlet to remove all dirt, grease, lime scale and heavy staining.
- Where fitted ā clean and disinfect cooker and oven to remove all dirt grease and heavy staining
Bathroom:
- Thoroughly clean and disinfect all sanitary ware and fittings to remove all dirt, grease, lime scale and heavy staining, including taps, plugs, w/c seat and waste outlets
7.0 Major Works
7.1 Definition
For purposes of void performance reporting (HouseMark) and distinguishing between types of repairs, please see below definition of Major Works on void. A void property that requires extensive works, which could not reasonably be carried out with a tenant in situ and need to be carried out while it is vacant, is classified as a āMajor Works Voidā. The major/investment works include structural works, site works, service installations and investment works. They are works that have prevented the letting of the property due to their scale and extent.
Built in major repair works include:
- Structural repairs – these are works that are essential to maintain stability and weather resistance in the main structural elements of a dwelling, i.e. floors, walls and roofs. Major works to these elements will involve replacement or substantial reconstruction of the component or element.
- Site works – this is work to the area around, and specific to, the dwellings involved and is essential to the safety, security and protection of tenants (e.g. Asbestos removal, or the replacement or substantial reconstruction of unstable boundary walls, footpaths etc.)
- Services installations – this is work to building services, where deterioration is such that the basic amenities in a dwelling could be seriously impaired. For example: renewal of installations such as gas, electricity and water supplies; heating and ventilation; and lifts.
- Consequential and other works – these are works required as a consequence of major repairs such as reinstatement or making good finishes and fittings.
- Any works that significantly improve the dwellings (i.e. capitalised repairs) should be classified as major repairs. Examples of such works are kitchens, bathrooms, central heating systems, roofs, windows and structure
Appendix 1: Kitchen Unit Schedule
Minimum Standards for Kitchen Storage Units and Appliance Spaces
|
Sink |
Cooker 2140_5a3d99-bc> |
Fridge/ |
Washing |
500 |
500 |
1000 |
500 |
1000 |
500 Tall |
Min. Length |
|---|---|---|---|---|---|---|---|---|---|---|
|
1 Person 2140_686590-ef> |
1 2140_d0ac0c-02> |
1 2140_c0af1e-46> |
1 2140_1077d0-bc> |
1 2140_045b05-8d> |
1 2140_c9cc50-78> | 2140_36a06c-8d> |
1 2140_1874e2-6c> |
1 2140_467a5c-89> |
1 2140_e222bd-38> |
2000 2140_32b4b0-bd> |
|
2 Person 2140_bafc12-13> |
1 2140_fa78c7-e8> |
1 2140_a8220a-36> |
1 2140_5fd6b5-52> |
1 2140_dbe461-f5> |
1 2140_146591-c1> | 2140_9ffc26-7a> |
1 2140_8d967f-f9> |
1 2140_55e0d2-4b> |
1 2140_8ba0c3-af> |
2000 2140_44e372-55> |
|
3 Person 2140_029679-da> |
1 2140_c548a5-60> |
1 2140_3fb52a-94> |
1 2140_12c837-a1> |
1 2140_16ba94-f5> |
1 2140_95dc78-9e> |
1 2140_853ed8-57> |
2 2140_2a66bd-fd> |
1 2140_676bd4-f6> |
1 2140_d10c8b-6f> |
2500 2140_fdb9a9-8b> |
|
4 Person 2140_01bc8d-a9> |
1 2140_ee98bd-f7> |
1 2140_9bcb44-a3> |
1 2140_77fdb6-b7> |
1 2140_0c70f6-f4> |
1 2140_8ecd36-c4> |
1 2140_3ed3d2-21> |
2 2140_34ed0e-04> |
1 2140_46ddf9-ed> |
1 2140_1076d2-0e> |
2500 2140_3d1fc0-ed> |
|
5 Person 2140_d74fbb-9f> |
1 2140_cea174-15> |
1 2140_8be390-14> |
1 2140_23f8a2-fb> |
1 2140_4820d4-cc> |
2 2140_af5f47-45> |
1 2140_fa9795-64> |
1 2140_0882fe-88> |
2 2140_b2ee84-35> |
1 2140_49817a-ea> |
3000 2140_342205-c0> |
|
6 Person 2140_8716af-6a> |
1 2140_2ed8fa-e4> |
1 2140_2aed7f-bb> |
1 2140_f1da78-6f> |
1 2140_8cfb98-41> |
1 2140_3eb2cb-ad> |
2 2140_a26b45-96> |
1 2140_ec3479-ed> |
2 2140_361bfe-fc> |
1 2140_68f084-0f> |
3500 2140_5fc435-59> |
|
7Person 2140_73b1cc-02> |
1 2140_7d612b-01> |
1 2140_c7ae36-46> |
1 2140_0cad37-f9> |
1 2140_b9a6a4-82> |
2 2140_c6c667-a4> |
2 2140_596a60-13> |
1 2140_578b41-52> |
2 2140_3b9eb6-c2> |
1 2140_86f869-87> | 2140_64407b-13> |
| 2140_2ce54c-f0> | 2140_d8d7a6-00> | 2140_850ba7-a9> |
Depth x Length | 2140_367a23-60> | 2140_bb6ef2-63> | 2140_1c1cb5-8a> | 2140_fb1ea8-24> | 2140_f16791-9f> |
Depth x | 2140_a9e52c-ba> |
|
(1) 2140_d0798d-cc> |
Sink top/drainer | 2140_06549f-57> |
600 x 1000 2140_176c74-e8> | 2140_7fb9ff-4f> |
(6) 2140_b05a6e-11> | 2140_f7a63f-4b> |
Single base unit 2140_a3236e-6f> | 2140_5055fc-5a> |
600 x 500 2140_6b12c4-8a> | 2140_4c03c6-6a> |
|
(2) 2140_1c1b65-97> |
Cooker Space 2140_49f8a5-b7> | 2140_c58059-47> |
600 x 600 2140_ad11fa-19> | 2140_cc5e7e-51> |
(7) 2140_a17d1a-53> | 2140_fd4702-7e> |
Alternatively, this may be | 2140_043161-95> | 2140_f36520-bf> | 2140_753bac-8a> |
|
(3) 2140_b8ab99-6e> |
Fridge/Freezer | 2140_d1bd13-3b> |
600 x 600 2140_0216bd-cd> | 2140_d9d606-dc> |
(8) 2140_43d5ab-88> | 2140_1117f4-33> |
600 mm high level single wall | 2140_2e19fd-68> |
300 x 500 2140_035539-46> | 2140_625bb2-ca> |
|
(4) 2140_9a5b80-70> |
Washing | 2140_20917d-ee> |
600 x 600 2140_22cb23-14> | 2140_6fc435-4a> |
(9) 2140_b89df2-b3> | 2140_e438c3-72> |
600 mm high level double | 2140_9cc47e-24> |
300 x 1000 2140_a0eef5-6e> | 2140_fbaabd-9f> |
|
(5) 2140_3d6c39-ca> |
Four Drawer | 2140_3f965e-f3> |
600 x 500 2140_a81191-dc> | 2140_991e0f-9d> |
(10) 2140_fa4d70-d6> | 2140_7a0dfd-ef> |
This unit may be omitted if | 2140_897aee-dc> | 2140_a71846-e9> | 2140_f3c21b-3c> |
Note: The base units can be provided by a useable corner space storage unit.